How to Batch Post Consumption | Microsoft Docs

If the flushing method is Manual, you must post the components manually, using a consumption journal.

You can also set the system up to automatically post (flush) components when you start or finish production orders. For more information, see Enable Flushing of Components According to Operation Output.

To post consumption for one or more production order lines

  1. Choose the Lightbulb that opens the Tell Me feature icon, enter Consumption Journal, and then choose the related link.
  2. Fill in the fields with the production order data and the consumption data. Hover over a field to read a short description.

    If the warehouse location where the components are stored is set up to use bins but does not require pick processing, assign a bin code to the journal line to indicate where the items should be taken from in the warehouse. For more information, see Pick for Production or Assembly.

  3. Choose the Post action to post the consumption. The related item ledger entries are reduced.

See Also

Manufacturing
Setting Up Manufacturing
Planning
Inventory
Purchasing
Working with Business Central



© 2019 Microsoft. All rights reserved.